{"product_id":"safe-work-method-statement-required-before-commencing-high-risk-work-sign","title":"Safe Work Method Statement Required Before Commencing High Risk Work Sign","description":"\u003cp\u003ePrincipal contractors need to show that no high risk construction work starts without a SWMS in place – a notice at the induction shed makes the rule visible to every worker and every inspector.\u003c\/p\u003e\u003cp\u003eA \u003cstrong\u003estatutory notice\u003c\/strong\u003e in AS 1319 notice format: white NOTICE on a blue band, black text on white. It reads SAFE WORK METHOD STATEMENT (SWMS) REQUIRED BEFORE COMMENCING ANY HIGH RISK CONSTRUCTION WORK – SEE SITE SUPERVISOR, reflecting the duty under WHS Regulation 299 for the 18 classes of high risk construction work. Portrait sizes from 225 x 300 mm to 600 x 900 mm. Confirm placement with your WHS officer or site safety plan.\u003c\/p\u003e\u003cp\u003eProudly \u003cstrong\u003eAustralian-made\u003c\/strong\u003e and finished with a protective \u003cstrong\u003ematt laminate\u003c\/strong\u003e for glare-free readability and long outdoor life. \u003cstrong\u003eChoose your size, material and finishing at checkout; both compliant and decorative material and size options are available.\u003c\/strong\u003e The sign is \u003cstrong\u003esupplied on its own, with no screws, zip ties or fixings included\u003c\/strong\u003e.\u003c\/p\u003e\u003cp\u003ePost it inside the induction shed, in the lunch room and beside the sign-in point so the requirement is seen before boots hit the deck. Pairs well with our \u003cstrong\u003eDrug and Alcohol Free Site Random Testing May Be Conducted\u003c\/strong\u003e and \u003cstrong\u003eSite Office\u003c\/strong\u003e. Made to order and dispatched within a \u003cstrong\u003e2–3 day turnaround\u003c\/strong\u003e.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eOrdering a full building or project sign schedule?\u003c\/strong\u003e Browse the \u003ca href=\"\/collections\/slim-statutory-format-signs\"\u003estatutory sign range\u003c\/a\u003e or \u003ca href=\"\/pages\/bulk-trade-pricing\"\u003erequest bulk and trade pricing\u003c\/a\u003e for multi-sign orders.\u003c\/p\u003e","brand":"SignShine","offers":[{"title":"Vinyl Sticker – Non-Reflective \/ 225mm x 300mm \/ No Finishing","offer_id":53931385028891,"sku":"SS-02928-STD-VINN-225X300-NF","price":18.9,"currency_code":"AUD","in_stock":true},{"title":"Vinyl Sticker – Non-Reflective \/ 300mm x 450mm \/ No Finishing","offer_id":53931385061659,"sku":"SS-02928-STD-VINN-300X450-NF","price":25.9,"currency_code":"AUD","in_stock":true},{"title":"Vinyl Sticker – Non-Reflective \/ 450mm x 600mm \/ No Finishing","offer_id":53931385094427,"sku":"SS-02928-STD-VINN-450X600-NF","price":42.9,"currency_code":"AUD","in_stock":true},{"title":"Vinyl Sticker – Non-Reflective \/ 600mm x 900mm \/ No Finishing","offer_id":53931385127195,"sku":"SS-02928-STD-VINN-600X900-NF","price":59.9,"currency_code":"AUD","in_stock":true},{"title":"Vinyl Sticker – Reflective \/ 225mm x 300mm \/ No Finishing","offer_id":53931385159963,"sku":"SS-02928-STD-VINR-225X300-NF","price":32.9,"currency_code":"AUD","in_stock":true},{"title":"Vinyl Sticker – Reflective \/ 300mm x 450mm \/ No Finishing","offer_id":53931385192731,"sku":"SS-02928-STD-VINR-300X450-NF","price":46.9,"currency_code":"AUD","in_stock":true},{"title":"Vinyl Sticker – Reflective \/ 450mm x 600mm \/ No Finishing","offer_id":53931385225499,"sku":"SS-02928-STD-VINR-450X600-NF","price":65.9,"currency_code":"AUD","in_stock":true},{"title":"Vinyl Sticker – Reflective \/ 600mm x 900mm \/ No Finishing","offer_id":53931385258267,"sku":"SS-02928-STD-VINR-600X900-NF","price":92.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 225mm x 300mm \/ No Finishing","offer_id":53931385291035,"sku":"SS-02928-STD-CORN-225X300-NF","price":23.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 225mm x 300mm \/ 4 Eyelets","offer_id":53931385323803,"sku":"SS-02928-STD-CORN-225X300-4EY","price":25.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 225mm x 300mm \/ 6 Eyelets","offer_id":53931385356571,"sku":"SS-02928-STD-CORN-225X300-6EY","price":26.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 225mm x 300mm \/ 8 Eyelets","offer_id":53931385389339,"sku":"SS-02928-STD-CORN-225X300-8EY","price":27.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 300mm x 450mm \/ No Finishing","offer_id":53931385422107,"sku":"SS-02928-STD-CORN-300X450-NF","price":33.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 300mm x 450mm \/ 4 Eyelets","offer_id":53931385454875,"sku":"SS-02928-STD-CORN-300X450-4EY","price":35.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 300mm x 450mm \/ 6 Eyelets","offer_id":53931385487643,"sku":"SS-02928-STD-CORN-300X450-6EY","price":36.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 300mm x 450mm \/ 8 Eyelets","offer_id":53931385520411,"sku":"SS-02928-STD-CORN-300X450-8EY","price":37.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 450mm x 600mm \/ No Finishing","offer_id":53931385553179,"sku":"SS-02928-STD-CORN-450X600-NF","price":49.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 450mm x 600mm \/ 4 Eyelets","offer_id":53931385585947,"sku":"SS-02928-STD-CORN-450X600-4EY","price":51.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 450mm x 600mm \/ 6 Eyelets","offer_id":53931385618715,"sku":"SS-02928-STD-CORN-450X600-6EY","price":52.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 450mm x 600mm \/ 8 Eyelets","offer_id":53931385651483,"sku":"SS-02928-STD-CORN-450X600-8EY","price":53.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 600mm x 900mm \/ No Finishing","offer_id":53931385684251,"sku":"SS-02928-STD-CORN-600X900-NF","price":74.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 600mm x 900mm \/ 4 Eyelets","offer_id":53931385717019,"sku":"SS-02928-STD-CORN-600X900-4EY","price":76.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 600mm x 900mm \/ 6 Eyelets","offer_id":53931385749787,"sku":"SS-02928-STD-CORN-600X900-6EY","price":77.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Non-Reflective \/ 600mm x 900mm \/ 8 Eyelets","offer_id":53931385782555,"sku":"SS-02928-STD-CORN-600X900-8EY","price":78.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 225mm x 300mm \/ No Finishing","offer_id":53931385815323,"sku":"SS-02928-STD-CORR-225X300-NF","price":36.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 225mm x 300mm \/ 4 Eyelets","offer_id":53931385848091,"sku":"SS-02928-STD-CORR-225X300-4EY","price":38.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 225mm x 300mm \/ 6 Eyelets","offer_id":53931385880859,"sku":"SS-02928-STD-CORR-225X300-6EY","price":39.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 225mm x 300mm \/ 8 Eyelets","offer_id":53931385913627,"sku":"SS-02928-STD-CORR-225X300-8EY","price":40.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 300mm x 450mm \/ No Finishing","offer_id":53931385946395,"sku":"SS-02928-STD-CORR-300X450-NF","price":52.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 300mm x 450mm \/ 4 Eyelets","offer_id":53931385979163,"sku":"SS-02928-STD-CORR-300X450-4EY","price":54.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 300mm x 450mm \/ 6 Eyelets","offer_id":53931386011931,"sku":"SS-02928-STD-CORR-300X450-6EY","price":55.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 300mm x 450mm \/ 8 Eyelets","offer_id":53931386044699,"sku":"SS-02928-STD-CORR-300X450-8EY","price":56.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 450mm x 600mm \/ No Finishing","offer_id":53931386077467,"sku":"SS-02928-STD-CORR-450X600-NF","price":76.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 450mm x 600mm \/ 4 Eyelets","offer_id":53931386110235,"sku":"SS-02928-STD-CORR-450X600-4EY","price":78.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 450mm x 600mm \/ 6 Eyelets","offer_id":53931386143003,"sku":"SS-02928-STD-CORR-450X600-6EY","price":79.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 450mm x 600mm \/ 8 Eyelets","offer_id":53931386175771,"sku":"SS-02928-STD-CORR-450X600-8EY","price":80.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 600mm x 900mm \/ No Finishing","offer_id":53931386208539,"sku":"SS-02928-STD-CORR-600X900-NF","price":116.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 600mm x 900mm \/ 4 Eyelets","offer_id":53931386241307,"sku":"SS-02928-STD-CORR-600X900-4EY","price":118.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 600mm x 900mm \/ 6 Eyelets","offer_id":53931386274075,"sku":"SS-02928-STD-CORR-600X900-6EY","price":119.9,"currency_code":"AUD","in_stock":true},{"title":"Corflute – Reflective \/ 600mm x 900mm \/ 8 Eyelets","offer_id":53931386306843,"sku":"SS-02928-STD-CORR-600X900-8EY","price":120.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 225mm x 300mm \/ No Finishing","offer_id":53931386339611,"sku":"SS-02928-STD-ACPN-225X300-NF","price":28.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 225mm x 300mm \/ Double Sided Tape","offer_id":53931386372379,"sku":"SS-02928-STD-ACPN-225X300-DST","price":30.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 225mm x 300mm \/ 4 Pre-Drilled Holes","offer_id":53931386405147,"sku":"SS-02928-STD-ACPN-225X300-4PH","price":30.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 225mm x 300mm \/ Post Mount Holes","offer_id":53931386437915,"sku":"SS-02928-STD-ACPN-225X300-PMH","price":30.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 300mm x 450mm \/ No Finishing","offer_id":53931386470683,"sku":"SS-02928-STD-ACPN-300X450-NF","price":40.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 300mm x 450mm \/ Double Sided Tape","offer_id":53931386503451,"sku":"SS-02928-STD-ACPN-300X450-DST","price":42.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 300mm x 450mm \/ 4 Pre-Drilled Holes","offer_id":53931386536219,"sku":"SS-02928-STD-ACPN-300X450-4PH","price":42.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 300mm x 450mm \/ Post Mount Holes","offer_id":53931386568987,"sku":"SS-02928-STD-ACPN-300X450-PMH","price":42.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 450mm x 600mm \/ No Finishing","offer_id":53931386601755,"sku":"SS-02928-STD-ACPN-450X600-NF","price":61.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 450mm x 600mm \/ Double Sided Tape","offer_id":53931386634523,"sku":"SS-02928-STD-ACPN-450X600-DST","price":63.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 450mm x 600mm \/ 4 Pre-Drilled Holes","offer_id":53931386667291,"sku":"SS-02928-STD-ACPN-450X600-4PH","price":63.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 450mm x 600mm \/ Post Mount Holes","offer_id":53931386700059,"sku":"SS-02928-STD-ACPN-450X600-PMH","price":63.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 600mm x 900mm \/ No Finishing","offer_id":53931386732827,"sku":"SS-02928-STD-ACPN-600X900-NF","price":98.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 600mm x 900mm \/ Double Sided Tape","offer_id":53931386765595,"sku":"SS-02928-STD-ACPN-600X900-DST","price":101.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 600mm x 900mm \/ 4 Pre-Drilled Holes","offer_id":53931386798363,"sku":"SS-02928-STD-ACPN-600X900-4PH","price":101.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Non-Reflective \/ 600mm x 900mm \/ Post Mount Holes","offer_id":53931386831131,"sku":"SS-02928-STD-ACPN-600X900-PMH","price":101.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 225mm x 300mm \/ No Finishing","offer_id":53931386863899,"sku":"SS-02928-STD-ACPR-225X300-NF","price":45.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 225mm x 300mm \/ Double Sided Tape","offer_id":53931386896667,"sku":"SS-02928-STD-ACPR-225X300-DST","price":47.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 225mm x 300mm \/ 4 Pre-Drilled Holes","offer_id":53931386929435,"sku":"SS-02928-STD-ACPR-225X300-4PH","price":47.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 225mm x 300mm \/ Post Mount Holes","offer_id":53931386962203,"sku":"SS-02928-STD-ACPR-225X300-PMH","price":47.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 300mm x 450mm \/ No Finishing","offer_id":53931386994971,"sku":"SS-02928-STD-ACPR-300X450-NF","price":62.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 300mm x 450mm \/ Double Sided Tape","offer_id":53931387027739,"sku":"SS-02928-STD-ACPR-300X450-DST","price":64.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 300mm x 450mm \/ 4 Pre-Drilled Holes","offer_id":53931387060507,"sku":"SS-02928-STD-ACPR-300X450-4PH","price":64.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 300mm x 450mm \/ Post Mount Holes","offer_id":53931387093275,"sku":"SS-02928-STD-ACPR-300X450-PMH","price":64.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 450mm x 600mm \/ No Finishing","offer_id":53931387126043,"sku":"SS-02928-STD-ACPR-450X600-NF","price":95.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 450mm x 600mm \/ Double Sided Tape","offer_id":53931387158811,"sku":"SS-02928-STD-ACPR-450X600-DST","price":97.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 450mm x 600mm \/ 4 Pre-Drilled Holes","offer_id":53931387191579,"sku":"SS-02928-STD-ACPR-450X600-4PH","price":97.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 450mm x 600mm \/ Post Mount Holes","offer_id":53931387224347,"sku":"SS-02928-STD-ACPR-450X600-PMH","price":97.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 600mm x 900mm \/ No Finishing","offer_id":53931387257115,"sku":"SS-02928-STD-ACPR-600X900-NF","price":153.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 600mm x 900mm \/ Double Sided Tape","offer_id":53931387289883,"sku":"SS-02928-STD-ACPR-600X900-DST","price":156.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 600mm x 900mm \/ 4 Pre-Drilled Holes","offer_id":53931387322651,"sku":"SS-02928-STD-ACPR-600X900-4PH","price":156.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium Composite Panel (ACP) – Reflective \/ 600mm x 900mm \/ Post Mount Holes","offer_id":53931387355419,"sku":"SS-02928-STD-ACPR-600X900-PMH","price":156.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 225mm x 300mm \/ No Finishing","offer_id":53931387388187,"sku":"SS-02928-STD-ALUN-225X300-NF","price":36.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 225mm x 300mm \/ Double Sided Tape","offer_id":53931387420955,"sku":"SS-02928-STD-ALUN-225X300-DST","price":39.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 225mm x 300mm \/ 4 Pre-Drilled Holes","offer_id":53931387453723,"sku":"SS-02928-STD-ALUN-225X300-4PH","price":39.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 225mm x 300mm \/ Post Mount Holes","offer_id":53931387486491,"sku":"SS-02928-STD-ALUN-225X300-PMH","price":39.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 300mm x 450mm \/ No Finishing","offer_id":53931387519259,"sku":"SS-02928-STD-ALUN-300X450-NF","price":52.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 300mm x 450mm \/ Double Sided Tape","offer_id":53931387552027,"sku":"SS-02928-STD-ALUN-300X450-DST","price":55.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 300mm x 450mm \/ 4 Pre-Drilled Holes","offer_id":53931387584795,"sku":"SS-02928-STD-ALUN-300X450-4PH","price":55.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 300mm x 450mm \/ Post Mount Holes","offer_id":53931387617563,"sku":"SS-02928-STD-ALUN-300X450-PMH","price":55.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 450mm x 600mm \/ No Finishing","offer_id":53931387650331,"sku":"SS-02928-STD-ALUN-450X600-NF","price":79.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 450mm x 600mm \/ Double Sided Tape","offer_id":53931387683099,"sku":"SS-02928-STD-ALUN-450X600-DST","price":81.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 450mm x 600mm \/ 4 Pre-Drilled Holes","offer_id":53931387715867,"sku":"SS-02928-STD-ALUN-450X600-4PH","price":81.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 450mm x 600mm \/ Post Mount Holes","offer_id":53931387748635,"sku":"SS-02928-STD-ALUN-450X600-PMH","price":81.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 600mm x 900mm \/ No Finishing","offer_id":53931387781403,"sku":"SS-02928-STD-ALUN-600X900-NF","price":127.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 600mm x 900mm \/ Double Sided Tape","offer_id":53931387814171,"sku":"SS-02928-STD-ALUN-600X900-DST","price":129.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 600mm x 900mm \/ 4 Pre-Drilled Holes","offer_id":53931387846939,"sku":"SS-02928-STD-ALUN-600X900-4PH","price":129.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Non-Reflective \/ 600mm x 900mm \/ Post Mount Holes","offer_id":53931387879707,"sku":"SS-02928-STD-ALUN-600X900-PMH","price":129.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 225mm x 300mm \/ No Finishing","offer_id":53931387912475,"sku":"SS-02928-STD-ALUR-225X300-NF","price":57.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 225mm x 300mm \/ Double Sided Tape","offer_id":53931387945243,"sku":"SS-02928-STD-ALUR-225X300-DST","price":59.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 225mm x 300mm \/ 4 Pre-Drilled Holes","offer_id":53931387978011,"sku":"SS-02928-STD-ALUR-225X300-4PH","price":59.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 225mm x 300mm \/ Post Mount Holes","offer_id":53931388010779,"sku":"SS-02928-STD-ALUR-225X300-PMH","price":59.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 300mm x 450mm \/ No Finishing","offer_id":53931388043547,"sku":"SS-02928-STD-ALUR-300X450-NF","price":81.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 300mm x 450mm \/ Double Sided Tape","offer_id":53931388076315,"sku":"SS-02928-STD-ALUR-300X450-DST","price":83.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 300mm x 450mm \/ 4 Pre-Drilled Holes","offer_id":53931388109083,"sku":"SS-02928-STD-ALUR-300X450-4PH","price":83.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 300mm x 450mm \/ Post Mount Holes","offer_id":53931388141851,"sku":"SS-02928-STD-ALUR-300X450-PMH","price":83.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 450mm x 600mm \/ No Finishing","offer_id":53931388174619,"sku":"SS-02928-STD-ALUR-450X600-NF","price":123.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 450mm x 600mm \/ Double Sided Tape","offer_id":53931388207387,"sku":"SS-02928-STD-ALUR-450X600-DST","price":125.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 450mm x 600mm \/ 4 Pre-Drilled Holes","offer_id":53931388240155,"sku":"SS-02928-STD-ALUR-450X600-4PH","price":125.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 450mm x 600mm \/ Post Mount Holes","offer_id":53931388272923,"sku":"SS-02928-STD-ALUR-450X600-PMH","price":125.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 600mm x 900mm \/ No Finishing","offer_id":53931388305691,"sku":"SS-02928-STD-ALUR-600X900-NF","price":197.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 600mm x 900mm \/ Double Sided Tape","offer_id":53931388338459,"sku":"SS-02928-STD-ALUR-600X900-DST","price":200.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 600mm x 900mm \/ 4 Pre-Drilled Holes","offer_id":53931388371227,"sku":"SS-02928-STD-ALUR-600X900-4PH","price":200.9,"currency_code":"AUD","in_stock":true},{"title":"Aluminium – Reflective \/ 600mm x 900mm \/ Post Mount Holes","offer_id":53931388403995,"sku":"SS-02928-STD-ALUR-600X900-PMH","price":200.9,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0956\/3537\/4363\/files\/hf_20260928_100630_b768c103-d8e1-498f-bff8-e5a1a3c80ee0.png?v=1790593889","url":"https:\/\/www.signshine.com.au\/products\/safe-work-method-statement-required-before-commencing-high-risk-work-sign","provider":"SignShine","version":"1.0","type":"link"}