Safe Work Method Statement Required Before Commencing High Risk Work Sign
$32.90 AUD
Regular price $22.90 AUDThe signs below are suggestions only and are not included in your order. Nothing is added to your cart unless you choose it.
Principal contractors need to show that no high risk construction work starts without a SWMS in place – a notice at the induction shed makes the rule visible to every worker and every inspector.
A statutory notice in AS 1319 notice format: white NOTICE on a blue band, black text on white. It reads SAFE WORK METHOD STATEMENT (SWMS) REQUIRED BEFORE COMMENCING ANY HIGH RISK CONSTRUCTION WORK – SEE SITE SUPERVISOR, reflecting the duty under WHS Regulation 299 for the 18 classes of high risk construction work. Portrait sizes from 225 x 300 mm to 600 x 900 mm. Confirm placement with your WHS officer or site safety plan.
Made to order and finished with a protective matt laminate for glare-free readability and long outdoor life. Choose your size, material and finishing at checkout. The sign is supplied on its own, with no screws, zip ties or fixings included.
Most popular choice: Aluminium Composite Panel (ACP) – Non-Reflective, 450mm x 600mm with 4 Pre-Drilled Holes.
Post it inside the induction shed, in the lunch room and beside the sign-in point so the requirement is seen before boots hit the deck. Pairs well with our Site Safety Induction Required Sign and Notice All Visitors Must Report to Site Office Sign. Made to order and dispatched within a 2–3 day turnaround.
Vinyl Sticker
Premium self-adhesive vinyl with a high-quality printed, UV-resistant finish. Suitable for both indoor and outdoor use. Peel-and-stick application onto any clean, smooth, flat surface — glass, metal, painted walls, doors, or existing signage. The most economical option in the range, with no drilling or mounting required.
Corflute
High-quality corrugated polypropylene (fluted plastic) board. Lightweight, fully weatherproof, and rust-proof — suitable for both indoor and outdoor use. Easy to fix with screws, cable ties, or star pickets. A premium, cost-effective choice that's tough enough to handle the elements while staying easy to install.
Aluminium Composite Panel (ACP)
A premium rigid panel with a solid polyethylene core bonded between two aluminium sheets. Lightweight yet strong, fully weatherproof, and won't rust, warp, or fade. Suitable for both indoor and outdoor use, with a clean, flat, professional finish — ideal for long-term, high-quality signage.
Aluminium Metal
High-quality solid sheet aluminium — the most heavy-duty option in the range. Naturally rust-proof, impact-resistant, and built to last. Suitable for both indoor and outdoor use, delivering maximum durability and a premium finish in any environment.
Vinyl Sticker — Reflective
Premium self-adhesive reflective vinyl with a high-quality UV-resistant finish. Suitable for both indoor and outdoor use. Printed on Class 1 retroreflective sheeting that lights up brightly when hit by headlights or a torch, keeping the sign clearly visible at night and in low light. Peel-and-stick application onto any clean, smooth, flat surface — no drilling or mounting required.
Corflute — Reflective
High-quality corrugated polypropylene (fluted plastic) board finished with premium reflective sheeting. Lightweight, fully weatherproof, and rust-proof — suitable for both indoor and outdoor use. The reflective surface glows brightly under headlights or torchlight for clear visibility after dark. Easy to fix with screws, cable ties, or star pickets.
Aluminium Composite Panel (ACP) — Reflective
A premium rigid panel with a solid polyethylene core bonded between two aluminium sheets, finished with Class 1 reflective sheeting. Lightweight yet strong, fully weatherproof, and won't rust, warp, or fade. Suitable for both indoor and outdoor use. The reflective face lights up brightly at night for maximum visibility — ideal for long-term, high-quality signage.
Aluminium Metal — Reflective
High-quality solid sheet aluminium with a premium reflective finish — the most heavy-duty option in the range. Naturally rust-proof, impact-resistant, and built to last. Suitable for both indoor and outdoor use. The Class 1 retroreflective surface shines brightly under headlights or torchlight, delivering maximum durability and night-time visibility in any environment.
Discounts apply per product — buy more of the same sign to unlock each tier. They're applied automatically at checkout:
- Buy 25 or more of the same sign — 5% off
- Buy 50 or more of the same sign — 10% off
- Buy 150 or more of the same sign — 15% off
Please note: quantities are counted per individual product and cannot be combined across different signs to reach a tier.
All signs are made to order and dispatched from our Australian facility. Flat-rate shipping applies per order:
- Standard shipping — $20 flat rate, Australia-wide
- Express shipping — $25
- FREE standard shipping on all orders over $500
Orders are typically processed within 2-3 business days. Delivery times vary by location across Australia.
$32.90 AUD
Regular price $22.90 AUDThe signs below are suggestions only and are not included in your order. Nothing is added to your cart unless you choose it.
Principal contractors need to show that no high risk construction work starts without a SWMS in place – a notice at the induction shed makes the rule visible to every worker and every inspector.
A statutory notice in AS 1319 notice format: white NOTICE on a blue band, black text on white. It reads SAFE WORK METHOD STATEMENT (SWMS) REQUIRED BEFORE COMMENCING ANY HIGH RISK CONSTRUCTION WORK – SEE SITE SUPERVISOR, reflecting the duty under WHS Regulation 299 for the 18 classes of high risk construction work. Portrait sizes from 225 x 300 mm to 600 x 900 mm. Confirm placement with your WHS officer or site safety plan.
Made to order and finished with a protective matt laminate for glare-free readability and long outdoor life. Choose your size, material and finishing at checkout. The sign is supplied on its own, with no screws, zip ties or fixings included.
Most popular choice: Aluminium Composite Panel (ACP) – Non-Reflective, 450mm x 600mm with 4 Pre-Drilled Holes.
Post it inside the induction shed, in the lunch room and beside the sign-in point so the requirement is seen before boots hit the deck. Pairs well with our Site Safety Induction Required Sign and Notice All Visitors Must Report to Site Office Sign. Made to order and dispatched within a 2–3 day turnaround.
Vinyl Sticker
Premium self-adhesive vinyl with a high-quality printed, UV-resistant finish. Suitable for both indoor and outdoor use. Peel-and-stick application onto any clean, smooth, flat surface — glass, metal, painted walls, doors, or existing signage. The most economical option in the range, with no drilling or mounting required.
Corflute
High-quality corrugated polypropylene (fluted plastic) board. Lightweight, fully weatherproof, and rust-proof — suitable for both indoor and outdoor use. Easy to fix with screws, cable ties, or star pickets. A premium, cost-effective choice that's tough enough to handle the elements while staying easy to install.
Aluminium Composite Panel (ACP)
A premium rigid panel with a solid polyethylene core bonded between two aluminium sheets. Lightweight yet strong, fully weatherproof, and won't rust, warp, or fade. Suitable for both indoor and outdoor use, with a clean, flat, professional finish — ideal for long-term, high-quality signage.
Aluminium Metal
High-quality solid sheet aluminium — the most heavy-duty option in the range. Naturally rust-proof, impact-resistant, and built to last. Suitable for both indoor and outdoor use, delivering maximum durability and a premium finish in any environment.
Vinyl Sticker — Reflective
Premium self-adhesive reflective vinyl with a high-quality UV-resistant finish. Suitable for both indoor and outdoor use. Printed on Class 1 retroreflective sheeting that lights up brightly when hit by headlights or a torch, keeping the sign clearly visible at night and in low light. Peel-and-stick application onto any clean, smooth, flat surface — no drilling or mounting required.
Corflute — Reflective
High-quality corrugated polypropylene (fluted plastic) board finished with premium reflective sheeting. Lightweight, fully weatherproof, and rust-proof — suitable for both indoor and outdoor use. The reflective surface glows brightly under headlights or torchlight for clear visibility after dark. Easy to fix with screws, cable ties, or star pickets.
Aluminium Composite Panel (ACP) — Reflective
A premium rigid panel with a solid polyethylene core bonded between two aluminium sheets, finished with Class 1 reflective sheeting. Lightweight yet strong, fully weatherproof, and won't rust, warp, or fade. Suitable for both indoor and outdoor use. The reflective face lights up brightly at night for maximum visibility — ideal for long-term, high-quality signage.
Aluminium Metal — Reflective
High-quality solid sheet aluminium with a premium reflective finish — the most heavy-duty option in the range. Naturally rust-proof, impact-resistant, and built to last. Suitable for both indoor and outdoor use. The Class 1 retroreflective surface shines brightly under headlights or torchlight, delivering maximum durability and night-time visibility in any environment.
Discounts apply per product — buy more of the same sign to unlock each tier. They're applied automatically at checkout:
- Buy 25 or more of the same sign — 5% off
- Buy 50 or more of the same sign — 10% off
- Buy 150 or more of the same sign — 15% off
Please note: quantities are counted per individual product and cannot be combined across different signs to reach a tier.
All signs are made to order and dispatched from our Australian facility. Flat-rate shipping applies per order:
- Standard shipping — $20 flat rate, Australia-wide
- Express shipping — $25
- FREE standard shipping on all orders over $500
Orders are typically processed within 2-3 business days. Delivery times vary by location across Australia.